Connecting The Ebp(S); To Install The Optional Ebp(S) For A Ups; Removing The Ebp Front Cover; Removing The Ups Cable Knockout - KStar MEMO PLUS RT II (MP9100RTII-0.9) 1-3K User Manual

1kva to 3kva 0track-tower conversion
Table of Contents

Advertisement

5. If you are installing power management software, connect your computer to one of the
communication ports or optional connectivity card. For the communication ports, use an
appropriate cable.
6. If your rack has conductors for grounding or bonding of ungrounded metal parts, connect
the ground cable (not supplied) to the ground bonding screw. See "Rear Covers" for the
location of the ground bonding screw for each model.
7. If an emergency power-off (disconnect) switch is required by local codes, see "Remote
Emergency Power-off" (REPO) to install the REPO switch before powering on
the UPS.
8. Continue to "UPS Initial Startup".

Connecting the EBP(s)

To install the optional EBP(s) for a UPS:

1. Remove the front cover of each EBP and UPS (see Figure 10).
It is the same with the installation of the front cover. (Refer" To install the UPS ")
2. On the bottom of the UPS front cover, remove the EBP cable knockout (see Figure 11).
3. For the bottom (or only) EBP, remove the EBP cable knockout on the top of the EBP front cover. See
Figure
12
for the location of the top EBP cable knockout.
4. If you are installing more than one EBP, for each additional EBP remove the EBP cable knockout on
Figure10 Removing the EBP Front Cover
Figure11 Removing the UPS Cable Knockout
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents