Ups Initial Startup; The Installation For Ups And Battery Box - KStar MEMO PLUS RT II (MP9100RTII-0.9) 1-3K User Manual

1kva to 3kva 0track-tower conversion
Table of Contents

Advertisement

1.Install the base, then place the RT UPS on the base one by one as
2. The cover installation and cable connection of the UPS and EBPS are the same as RT. (To install the
optional EBP(s) for a UPS)

UPS Initial Startup

To start up the UPS:
N OTE Verify that the total equipment ratings do not exceed the UPS capacity to
0 T
prevent an overload alarm.
1 . If optional EBPs are installed, verify that the EBPs are connected to the UPS.
0 T
2 . Plug the equipment to be protected into the UPS, but do not turn on the
0 T
3 . Make any necessary provisions for cord retention and strain relief.
0 T
4 . Plug the detachable UPS power cord into the input connector on the UPS rear
0 T
5 . Plug the UPS power cord into a power outlet. The UPS front cover display
0 T
6 .
0 T
Figure15 The installation for UPS and battery box
protected equipment.
cover.
illuminates.
The UPS will do self-test when power on.
charge the battery. If the output displayed on LCD is "0", there is no output. If
you need the UPS output the utility without starting the UPS when plug into
the utility,you need to set bPS option to "ON" on the setting mode,refer to
Page 26.
Fig.15
17
shows.
After that,
the charger will

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents