Load Segments; Epo Connections - KStar MEMO PLUS RT II (MP9100RTII-0.9) 1-3K User Manual

1kva to 3kva 0track-tower conversion
Table of Contents

Advertisement

emergency power-off function is activated.
NOTE For Europe, the emergency switch requirements are detailed in Harmonized
document HD-384-48 S1, "Electrical Installation of the Buildings, Part 4: Protection
for Safety Chapter 46: Isolation and Switching."
Wire Function
EPO
NOTE Leave the EPO connector installed onto the EPO port of the
if the EPO function is not needed.
S ee Figure
0 T
the EPO connector contacts.
0 T
Y ou can set the EPO polarity. See the "EPO Input Polarity" setting
0 T
Settings" on page 29.
N OTE Depending on user configuration, the pins must be shorted or opened to keep
0 T
the UPS running. To restart the UPS, reconnect (re-open) the EPO connector pins and
turn on the UPS manually. Maximum resistance in the shorted loop is 10 ohm.
N OTE Always test the EPO function before applying your critical load to avoid
0 T
accidental load loss.

Load Segments

L oad segments are sets of receptacles that can be controlled by power
0 T
management software or through the display, providing an orderly shutdown and
startup of your equipment. For example, during a power outage, you can keep
critical equipment running while you turn off other equipment. This feature allows
you to save battery power.
Each UPS has two load segments:
0 T
● Load Segment 1: The power shedding battery voltage of this segment can be set
0 T
by LCD.
● Load Segment 2.
0 T
S ee "Rear Covers" on page
0 T

EPO Connections

Terminal Wire Size Rating
L1
4–0.32 mm2 (12–22 AWG)
L2
17, 18
on page
Figure 21
E PO Connections
0 T
35
for EPO location. Figure
49
for load segments for each UPS model.
38
Suggested Wire Size
0.82 mm2 (18 AWG)
21