Input Carrier - JLG 600SJ Service And Maintenance Manual

Table of Contents

Advertisement

1A. Spindle
1D. Housing
1E. Ring Gear

3. Input Carrier

5. Remove the First Stage Sun Gear (10) if applicable.
NOTE: On units with ratios greater than 36:1 numerically,
there will not be a separate First Stage Sun Gear
(10), as the gear teeth will be integral to the Input
Shaft (9).
6. Remove the Input Carrier Subassembly (3).
7. Remove the Input Shaft (9).
8. Remove the Second Stage Sun Gear (11).
NOTE: On units with a ratio 48:1, the Sun Gear (11) and the
Input Shaft (9) will need to be removed together.
9. Loosen and remove the three Flat Head Bolts (19)
that retain the Ring Gear (1E) to the Housing (1G).
10. Lift the Ring Gear (1E) off of the Housing (1D).
3121202
5. Retaining Ring
4. Planet Gear
9. Input Shaft
4E. Planet Shaft
10. First Stage Sun Gear
4G. Roll Pin
11. Second Stage Sun
4H. Thrust Washer
Gear
Figure 3-2. Input Carrier
– JLG Lift –
SECTION 3 - CHASSIS & TURNTABLE
18. O-ring
19. Bolt
20. Retaining Ring
11. Remove the O-ring (18) from between the Housing
(1D) and the Ring Gear (1E).
12. Using a 1/8" diameter punch, drive the Roll Pin (4G)
into the Planet Shaft (4E) until it bottoms against the
Spindle (1A).
13. Grasp the Roll Pin (4G) using needle nosed pliers or
some sort of hooked tool, and pull the Planet Shaft
(4E) out of the Spindle (1A).
14. Using a 1/8" diameter punch, drive the Roll Pin (4G)
out of the Planet Shaft (4E).
NOTE: The Roll Pins (4G) should not be reused when reas-
sembling the unit.
3-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

600s660sj

Table of Contents