Rotary Coupling - JLG 600SJ Service And Maintenance Manual

Table of Contents

Advertisement

3.10 ROTARY COUPLING

Use the following procedure to install the seal kit.
NOTE: Step 1 applies to machines S/N 75606 to Present.
1. If not already removed, remove the axle oscillation
valve from the cylinder barrel. The spool of the valve
protrudes into the barrel and will damage the spool
and seals if left in place.
2. Remove snap ring (12) from end.
3. Remove thrust ring (13) from the same end.
4. Remove center body (10) from housing (11).
5. Cut off old seals (14,15,17,18).
6. Assemble lip seals (14) in direction shown in Figure
3-48., Rotary Coupling - Sheet 2 of 2.
7. Reassemble O-ring (18).
8. Heat cap seals (17) in hydraulic oil for 5 minutes at
300° F (149° C).
9. Assemble cap seals over O-rings
10. Reinsert center body into housing (lube with hydrau-
lic oil).
11. Replace thrust ring and snap ring.
3121202
SECTION 3 - CHASSIS & TURNTABLE
– JLG Lift –
3-51

Advertisement

Table of Contents
loading

This manual is also suitable for:

600s660sj

Table of Contents