Dimension Of Sheaves When New - JLG 600SJ Service And Maintenance Manual

Table of Contents

Advertisement

SECTION 4 - BOOM & PLATFORM
NOTE: To check the size, contour and amount of wear, a
groove gauge is used. Replace the sheave if worn as
shown in the following drawing.
Figure 4-13. Dimension of Sheaves When New
2. Inspect extend and retract wire rope sheave bear-
ings for wear, scoring, or other damage, and for
ovality.
3. Inspect extend wire rope and retract wire rope
sheave pins for scoring, tapering and ovality.
Replace pins as necessary.
4. Inspect telescope cylinder sheave pin for scoring,
tapering and ovality. Replace pins as necessary.
5. Inspect boom pivot pin for wear, scoring, tapering
and ovality, or other damage. Replace pins as nec-
essary.
4-10
6. Inspect telescope cylinder attach point for scoring,
tapering and ovality. Replace pins as necessary.
7. Inspect upper lift cylinder attach pin for wear, scor-
ing, tapering and ovality, or other damage. Ensure
pin surfaces are protected prior to installation.
Replace pins as necessary.
8. Inspect inner diameter of boom pivot bushing for
scoring, distortion, wear, or other damage. Replace
bearing as necessary.
9. Inspect all wear pads for excessive wear or other
damage. Replace pads when worn to within 1/8 inch
(3.2 mm) of threaded insert.
10. Inspect extend and retract wire rope attach point
components for cracks, stretching, distortion, or
other damage. Replace components as necessary.
11. Inspect all threaded components for damage such
as stretching, thread deformation, or twisting.
Replace as necessary.
12. Inspect structural units of boom assembly for bend-
ing, cracking, separation of welds, or other damage.
Replace boom sections as necessary.
– JLG Lift –
3121202

Advertisement

Table of Contents
loading

This manual is also suitable for:

600s660sj

Table of Contents