Rack Installation; Cable Connection; Connecting To Ac Mains And Loads; Figure 9 Tower Installation - Liebert GXT4 User Manual

Hide thumbs Also See for GXT4:
Table of Contents

Advertisement

5. Place the Liebert GXT4 and any battery cabinets on the support bases. Each Liebert GXT4 needs
four support bases, as shown in Figure 9.
Figure 9
Tower installation
Liebert GXT4 UPS
2.4.2

Rack Installation

The Liebert GXT4 UPS and external battery cabinets (EBC), when installed in a rack enclosure, must
be supported by a shelf or rack-mount rails. The Liebert GXT4 UPS and EBC units ship with all
required hardware to allow rack-mount installation (not included with "E" models). Because different
rack-mount options install differently, refer to the installation instructions provided with the rack
mount kit being used.
2.5

Cable Connection

The Liebert GXT4 rear panel has an input receptacle and output receptacles. Refer to 1.3.2 - Rear
Panel Features for details. The battery cables are supplied with the battery cabinet.
2.5.1

Connecting to AC Mains and Loads

NOTE
Ensure that all the loads are turned Off.
Prepare an input power supply that is properly protected by a circuit breaker in accordance
with national and local electrical codes. The wall receptacle must be grounded.
Emerson
the Liebert GXT4's input circuit breaker.
The specification of input circuit breaker on the rear panel of the UPS is given in Table 2.
Table 2
Input circuit breaker specifications
Unit Rating
700-1500 VA Models
2000-3000VA Models
®
Liebert
GXT4
Operation and
Display Panel
Rotated for
Tower Operation
Support
Bases
®
recommends installing an upstream circuit breaker of the same or higher rating as
Circuit Breaker Rating
10A
16A
Liebert GXT4 UPS and
External Battery Cabinet
12
Installation
Support
Bases

Hide quick links: