Panasonic S-45PU1E5 Technical Data & Service Manual page 383

Inverter r410a
Table of Contents

Advertisement

4. Test Operation
Implementing a Test Run
1. Turn the #1 DIP switch of the operation panel from OFF to ON (Down
control with its Start/Stop button.
2. During a test run, all display lamps on the display will light up.
3. During a test run, it is not possible to adjust the temperature.
4. After completing a test run, be absolutely sure to turn the #1 DIP switch from ON to OFF (Up
sure none of the display lamps are blinking. Also, replace the PCB cover back as it was and fasten it; while holding
the wiring in the cable clamp, tighten its screw.
NOTE
(1)
This is hard on the device, so only use this for the test run.
(2)
After turning on the power, the unit will not receive any commands from the remote control for about 1 minute.
This is not an error. (In fact it does receive signals, but they are cancelled)
5. Setting Address Switches
When more than one display/operation panel and remote control are installed in the same room, setting up addresses
allows them to avoid interfering with each other.
Refer to the Users Manual for information on how to change the addresses of the remote controls.
Address Display
on the Remote
Control
Position of the
It doesn't matter
Receiver's
where the receiver's
Address Switch
address switch is.
DIP Switch Bit 1
Fig. 8-23
Up) and operate the wireless remote
8-23
Down) and make
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents