Panasonic S-45PU1E5 Technical Data & Service Manual page 171

Inverter r410a
Table of Contents

Advertisement

Precautions when operating the 3-way valve for piping installation
Do not open the 3-way valve until the piping installation is completed.
• It is closed during shipment.
• During installation the side panel may warp if only the fl are nut is loosened and tightened with a torque wrench. As a
result, always be sure to secure to the hexagonal part of the 3-way valve with a spanner, or other tool.
Refer to the following table for the tightening torque of the 3-way valve fl are nuts.
• If the nuts are over tightened, they may cause the fl ares to break or leak.
Do not add additional force to the valve's cover.
• Using spanners on the cover or valve itself (other than the hexagonal parts) may cause gas leakage.
Avoid using spanners on the cover or parts other than the hexagonal part of the valve.
During the cooling mode operation under low ambient pressure, the low
pressure side of the valve can be prone to freezing. Secure the fl are nut
(shared gas side / liquid side) section of the valve with a silicone sealing
agent to prevent this from occurring.
[3-way valve operation method]
Precautions for handling the valve cap
Ensure not to scratch the inner surface of the valve or the end of the
valve shaft.
• Once adjustments to the valve are completed, ensure to tighten the
valve cap according to the prescribed torque.
Precautions for handling the service ports
Use a push-rod with a charge hose.
• Once adjustments to the valve are completed, ensure to tighten the
valve cap according to the prescribed torque.
Precautions for connecting the pipes
Ensure that the pipes do not come into contact with the compressor's
bolts or exterior panel.
There is a risk of condensation from the 3-way valve coming out between
the insulation material and the indoor unit's piping when you install the
outdoor unit above then the indoor unit. Ensure to caulk the connection
parts.
Precautions for insulation installation
In high humidity environment, reinforce the insulation material for the refrigerant piping. Failure to do so may result in
condensation on the surface of the insulation material.
Use materials with good heat-resistant properties as the heat insulator for the pipes. Ensure to insulate both the gas side
and liquid side pipes.
If the pipes are not adequately insulated, condensation and water leakages may occur.
Ensure that the current insulation covers the pipes up to the unit's connecting part.
If the piping is exposed , it may cause condensation or burn (when touch the pipe).
Valve shaft
Valve cap
Spanner
(Secure)
Flare nut
• Use an Allen wrench (Size 4 mm or 6 mm).
Direction to open
Opening : Open the cover and turn the Allen wrench counter-clockwise until it stops.
Closing : Open the cover and turn the Allen wrench clockwise until it stops.
Maximum temperature limit of gas or liquid piping exceeds 120 °C
Service port
Hexagonal part
of the valve
Torque
wrench
Valve size
ø9.52
ø15.88
Tightening torque
10.7N•m~14.7N•m
(1.1kgf•m~1.5kgf•m)
Piping
Insulation
material
1-165
Silicone sealing agent
(Ensure not to leave any holes)
Tightening torque
20.6N•m~28.4N•m
(2.1kgf•m~2.8kgf•m)
48.0N•m~59.8N•m
(4.8kgf•m~6.0kgf•m)
Caulking treatment, etc.
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents