C 3 00 (0 5 + 0 6 ) & G50
Leaf Spring Installation
l. Clean axle spring pad and position spring assembly to
axle. Position spring to insure clearance to hangers.
The shackle assembly must be attached to the rear
spring eye before installing shackle to rear hanger
Fig. 3D-13--Rear Spring Installation - G Models
(Cutaway Vans)
G 1 0 0 + 2 0 0 (0 5 + 0 6 ) ALL
G 300 ( 0 5 + 0 6 ) exc G50
Fig. 3D-12--Rear Spring Hangers And Installation-G Models
shackle must be positioned with arrow pointing
forward.
2. Install spring retainer plate and " U " bolts. Loosely
install retaining nuts evenly, but do not torque at this
time.
(C utaw ay Vans)
REAR SUSPENSION
3D -5