Installing The Ap3550 To A Pole - Extreme Networks Altitude 3550 Deployment Manual

Table of Contents

Advertisement

On each long screw, install one split washer and one wing nut. Leave them somewhat loose, as the
nut, washer and screw will be loosened and re-installed in the field when mounting the AP3550 to a
Pole.
NOTE
The unit is ready to be moved into its deployment area and mounted onto a pole (where the AP3550 cannot be
slid over the pole end).

Installing the AP3550 to a Pole

To install an AP3550 to a pole:
1 Select the proper slot positions for the pole clamp to properly fit onto the pole. Position and hold the
tilt bracket. Align each of the 2 pole clamps in position on the pole. Install 2 long binder head screws
through the two holes of one clamp and into the other clamp. Direction is not important.
Install one split washer and one wing nut onto each long screw. Lightly tighten the wing nut,
washer and screw.
Point the tilt bracket in the direction the AP3550 is to be mounted, and tighten the wing nut, washer
and screw
Altitude 3550 Access Point Deployment Guide
11

Advertisement

Table of Contents
loading

Table of Contents