Extreme Networks Altitude 3550 Deployment Manual page 24

Table of Contents

Advertisement

Power Tap Installation
9 Install the power cable ring terminals using the 2 screws and nut removed in steps 3 and 4.
Black wire to terminal L (line)
White wire to terminal N (neutral)
Green wire to terminal G (ground)
10 Firmly tighten screws and nut.
11 Adjust the cable jacket by sliding into and out of the gland until about 1 inch remains visible inside
the housing.
Tighten the gland nut by hand to firmly hold the cable jacket. Examine all wires to ensure there is no
crimping pulling of wires or terminations.
24
Altitude 3550 Access Point Deployment Guide

Advertisement

Table of Contents
loading

Table of Contents