Extreme Networks Altitude 3550 Deployment Manual page 14

Table of Contents

Advertisement

Mounting Kit Assembly and Use
Thread the free end of the band clamp through the adjuster. Pass through the screw, and pull the
free end of the clamp until it is snug. Repeat this process for the second clamp.
Point the tilt bracket in the direction the AP3550 is to be mounted. Tighten the band clamps. Cut off
or wrap around (as displayed above) the free end of the tightened band clamp.
7 Install the AP3550's mounting bracket onto the tilt bracket. Use one long binder head screw and hex
nut from the kit. This will provide the pivot about which the AP3550 can be tilted. Do not over
tighten the nut.
The image displayed has the heavy weather accessory kit installed. Whether the unit uses the heavy
weather kit or not, remember to connect the AP3550 to an appropriate earth ground using the earth-
ground boss on the back of the unit.
14
Altitude 3550 Access Point Deployment Guide

Advertisement

Table of Contents
loading

Table of Contents