Extreme Networks Altitude 3550 Deployment Manual page 25

Table of Contents

Advertisement

12 Ensure no loose hardware is inside the housing. Check the wiring to be sure it is clear of the cover.
Carefully replace the cover. Only the correct cover orientation (as displayed below) allows all screws
to be properly installed.
Tighten all 10 screws securely.
The Power Tap can now be installed in an almost identical manner as the AP3550 model access
point following the instructions within
NOTE
Please locate the earth ground boss under the bracket of the Power Tap. This point must be properly grounded to
earth to utilize this product's safety features.
13 Add the required grounding lug or cable (not included with this product) the earth ground boss.
14 Seal un-used connectors to ensure the product's IP56 rating.
Altitude 3550 Access Point Deployment Guide
"Mounting Kit Assembly and Use" on page
9.
25