Extreme Networks Altitude 3550 Deployment Manual page 12

Table of Contents

Advertisement

Mounting Kit Assembly and Use
2 Install the mounting bracket onto the tilt bracket installed in step 1. Use one long binder head screw
and hex nut from the kit. This will provide the pivot about which the AP3550 can be tilted. Do not
over tighten the nut.
3 Install 4 short binder head screws in the 4 slots (two each on left and right sides of the tilt bracket).
Set the angle of the AP3550 up or down as required for the installation. The 4 short binder head
screws and the long screw hex nut can all be tightened to lock the unit into position.
The image displayed above has the heavy weather accessory kit installed. Whether the unit is
installed with the heavy weather kit, or without it, it will be important to connect the AP3550 to an
appropriate earth ground using the earth-ground boss on the back of the unit.
NOTE
It is necessary to use the band clamp adapter when installing an AP3550 on a larger diameter pole (up to 18
inches).
12
Altitude 3550 Access Point Deployment Guide

Advertisement

Table of Contents
loading

Table of Contents