Extreme Networks Altitude 3550 Deployment Manual page 18

Table of Contents

Advertisement

Heavy Weather Kit Assembly and Use
2 Route the antenna extension cables through the cable guides on the rear of the access point. The
cables cross from left to right to maximize the bend radius. Avoid any sharp bending of the cables to
extend their useful life.
NOTE
Note the earth ground boss on the AP3550. This point must be properly grounded to earth to utilize this products
safety features. This is a good time to add the required grounding lug or cable (not included).
3 Install the heavy weather shield. Align the 4 screw holes with the 4 mating screw bosses on the
AP3550.
18
Altitude 3550 Access Point Deployment Guide

Advertisement

Table of Contents
loading

Table of Contents