Control Valve (If Previously Removed) - International VT 365 Service Manual

2004-2006 model years
Hide thumbs Also See for VT 365:
Table of Contents

Advertisement

ELECTRONICALLY CONTROLLED VARIABLE GEOMETRY
70
18. Remove cap and align the arrow on the inlet duct
with the mark on the inlet housing opening on VGT
and press on the VGT.
19. Secure air inlet duct to VGT by tightening hose
clamp to the special torque (Table 5).
Figure 75
Air inlet duct
1.
Lube oil fill extension tube
2.
Breather hose
3.
Air inlet duct
20. Remove cap from the valve cover and thread the
oil fill extension tube in the valve cover and torque
to the special torque (Table 5).

Control Valve (If previously removed)

Figure 76
O-ring lubrication
Read all safety instructions in the "Safety Information" section of this manual before doing any procedures.
TURBOCHARGER (VGT)
1. During reassembly, lubricate new O-rings with
Figure 77
2. Install control valve carefully to avoid twisting or
NOTE: Do not use the retaining bolt to draw the control
valve into the housing. Push the VGT control valve in
by hand to seat securely before installing bracket and
bolt.
Figure 78 Retaining bolt for VGT Control valve
1.
2.
EGES295-2
Follow all warnings, cautions, and notes.
© 2006 International Truck and Engine Corporation
clean engine oil. Make sure O-rings are seated
correctly – not twisted or distorted.
VGT control valve
cutting O-rings.
VGT control valve bracket
Retaining bolt

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents