International VT 365 Service Manual page 73

2004-2006 model years
Hide thumbs Also See for VT 365:
Table of Contents

Advertisement

ELECTRONICALLY CONTROLLED VARIABLE GEOMETRY
14. Prelubricate the oil inlet hole of the VGT with clean
engine oil and spin compressor wheel several
times to coat bearings with oil. Refill the oil inlet
hole up to oil supply tube mounting surface.
Figure 72 Oil supply tube for VGT
1.
Oil supply tube
2.
Mounting bolt (2)
15. Position oil supply tube over a new gasket and
secure with two M8 x 20 bolts.
16. Tighten to the standard torque (Standard Torques,
page 375).
Alternate tightening between both
bolts until the correct torque is reached.
Read all safety instructions in the "Safety Information" section of this manual before doing any procedures.
TURBOCHARGER (VGT)
Figure 73
crankcase breather
17. Remove cap and press pitot tube in the crankcase
Figure 74
1.
2.
EGES295-2
Follow all warnings, cautions, and notes.
© 2006 International Truck and Engine Corporation
Breather tube with pitot tube in
breather until it locks in place.
Air inlet duct to VGT
VGT
Air inlet duct
69

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for International VT 365

Table of Contents