Switch Chassis; General Installation Guidelines - Edge-Core ECS5610-52S Installation Manual

48-port layer 3 10g top-of-rack switch
Table of Contents

Advertisement

3

General Installation Guidelines

Switch Chassis

The switch is designed to be installed in a standard 19-inch equipment rack.
Before continuing with switch installation, first review the general guidelines and
switch cooling requirements in this chapter.
This chapter includes these sections:
"General Installation Guidelines" on page 23
"How to Install the Switch in a Rack" on page 24
"Switch Cooling Requirements" on page 26
Be sure to follow the guidelines below when choosing a location.
The installation location should:
be able to maintain its temperature within -40 to 70 °C (-40 to 158 °F) and
its humidity within 5% to 95%, non-condensing.
provide adequate space (approximately five centimeters or two inches) on
all sides for proper air flow.
be accessible for installing, cabling and maintaining the device.
allow the status LEDs to be clearly visible.
Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical interference, such as
radios and transmitters.
Make sure that the unit is connected to a separate grounded power outlet and
is powered from an independent circuit breaker. As with any equipment, using
a filter or surge suppressor is recommended. Verify that the external power
requirements for the switch can be met as listed under
Modules" on page
29.
– 23 –
"Power Supply

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ECS5610-52S and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

As5600-52xAs5610-52x

Table of Contents