Switch Chassis; General Installation Guidelines - Edge-Core ECS4510 Series Installation Manual

28/52-port layer 2+ stackable ge switch
Table of Contents

Advertisement

3

General Installation Guidelines

Switch Chassis

The switch is designed to be installed in a standard 19-inch equipment rack.
Before continuing with switch installation, first review the general guidelines and
switch cooling requirements in this chapter.
This chapter includes these sections:
"General Installation Guidelines" on page 23
"Switch Cooling Requirements" on page 24
"How to Install the Switch in a Rack" on page 25
"How to Install the Switch on a Shelf or Desktop" on page 27
"Optional Media Expansion Module" on page 28
"How to Install an Optional Media Expansion Module" on page 28
Be sure to follow the guidelines below when choosing a location.
The installation location should:
be able to maintain its temperature within 0 to 45 ° C (32 to 113 ° F) and its
humidity within 5% to 95%, non-condensing.
provide adequate space (approximately five centimeters or two inches) on all
sides for proper air flow.
be accessible for installing, cabling and maintaining the device.
allow the status LEDs to be clearly visible.
Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical interference, such as
radios and transmitters.
– 23 –

Advertisement

Table of Contents
loading

Table of Contents