Switch Installation Tasks; Figure 7: Installing The Switch In A Rack - Edge-Core ECS5610-52S Installation Manual

48-port layer 3 10g top-of-rack switch
Table of Contents

Advertisement

Switch Installation Tasks

Task 1
Task 2
Follow these tasks to install the switch in your network. For full details on each task,
go to the relevant chapter or section by clicking on the link.
Caution:
Before installing your switch, first review all the safety statements and
guidelines in the Regulatory and Safety Information document.
Unpack package and check contents
Unpack your switch and check the package contents to be sure you have received
all the items. See
"Package Contents" on page
Install the Chassis
The switch is designed to be installed in a standard 19-inch equipment rack. Plan
your rack installation and install the switch chassis in the rack. Be sure to take into
account switch cooling requirements.
Go to the chapter

Figure 7: Installing the Switch in a Rack

1
Attach the brackets to the switch,
18.
"Switch Chassis"
2
– 19 –
Chapter 2
| Installation Overview
Switch Installation Tasks
2
Use the rack mounting screws supplied
with the rack to secure the switch in the
rack.
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

As5600-52xAs5610-52x

Table of Contents