Quick Start Guide
Ethernet Switch
ECS5550-30X | ECS5550-54X
1.
Ethernet Switch ECS5550-30X or ECS5550-54X
2.
Rack mounting kit—2 front-post brackets, 2 rear-post brackets,
and 16 screws
3.
AC power cord
1
2
5
6
1.
Management Ports: 1000BASE-T RJ-45, RJ-45 console, USB
2.
System LEDs
3.
24 or 48 x 10G SFP+ ports
4.
6 x 100G QSFP28 ports
SYS: Green (OK), Flashing Green (booting), Yellow (fault)
MST: Green (stack master)
STACK: Green (stack mode)
FAN: Green (OK), Yellow (fault)
PSU: Green (OK), Yellow (fault)
FRU Replacement
PSU Replacement
1.
Remove the power cord.
2.
Press the release latch and
remove the PSU.
3.
Install replacement PSU with
matching airflow direction.
Package Contents
1
3
7
System LEDs/Buttons
Fan Tray Replacement
1.
Press the release latch in the
fan tray handle.
2.
Remove fan tray from the
chassis.
3.
Install replacement fan with
matching airflow direction.
2
3
4.
Console cable—RJ-45 to DE-9
5.
Grounding wire
6.
Documentation—Quick Start Guide (this document) and Safety
and Regulatory Information
Overview
4
1
2
5
5.
Grounding screw (maximum torque 10 kgf-cm (8.7 lb-in))
6.
4 x fan trays
7.
2 x AC PSUs
SFP+ 10G LEDs: Green (10G), Orange (1G or 2.5G)
QSFP28 LEDs: Green (100G or 40G)
– 1 –
www.edge-core.com
4
5
3
6
6
4
7
E012025-CS-R01
150200002699H
Need help?
Do you have a question about the ECS5550-30X and is the answer not in the manual?
Questions and answers