Installation Overview; Package Contents - Edge-Core ECS5610-52S Installation Manual

48-port layer 3 10g top-of-rack switch
Table of Contents

Advertisement

2

Package Contents

Installation Overview

This chapter includes these sections:
"Package Contents" on page 18
"Switch Installation Tasks" on page 19
After unpacking the switch, check the contents to be sure you have received all the
components.
ECS5610-52S 10G Top-of-Rack Switch
Rack Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
Power cord—either US, Continental Europe or UK
Console cable (RJ-45 to DB-9)
Quick Start Guide
Regulatory and Safety Information
Documentation CD—includes Installation Guide and Management Guide
– 18 –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

As5600-52xAs5610-52x

Table of Contents