2
Package Contents
Switch Installation Tasks
Installation Overview
This chapter includes these sections:
◆
"Package Contents" on page 17
◆
"Switch Installation Tasks" on page 17
After unpacking the switch, check the contents to be sure you have received all the
components.
◆
AS4600-54T Top-of-Rack Switch equipped with either one or two PSUs
◆
Rack Mounting Kit containing two standard brackets and eight screws for
attaching the brackets to the switch
◆
Grounding wire
◆
Power cord—either Japan, US, Continental Europe, or UK
◆
Console cable (RJ-45 to DB-9)
◆
Safety and Regulatory Information
◆
Quick Start Guide
Follow these tasks to install the switch in your network. For full details on each task,
go to the relevant chapter or section by clicking on the link.
Caution:
Before installing your switch, first review all the safety statements and
guidelines in the Safety and Regulatory Information document.
– 17 –