Installation Overview; Package Contents; Switch Installation Tasks - Edge-Core AS4600-54T Installation Manual

48 ge port with 4*10g sfp+ with 2 expansion slots data center switch
Hide thumbs Also See for AS4600-54T:
Table of Contents

Advertisement

2

Package Contents

Switch Installation Tasks

Installation Overview

This chapter includes these sections:
"Package Contents" on page 17
"Switch Installation Tasks" on page 17
After unpacking the switch, check the contents to be sure you have received all the
components.
AS4600-54T Top-of-Rack Switch equipped with either one or two PSUs
Rack Mounting Kit containing two standard brackets and eight screws for
attaching the brackets to the switch
Grounding wire
Power cord—either Japan, US, Continental Europe, or UK
Console cable (RJ-45 to DB-9)
Safety and Regulatory Information
Quick Start Guide
Follow these tasks to install the switch in your network. For full details on each task,
go to the relevant chapter or section by clicking on the link.
Caution:
Before installing your switch, first review all the safety statements and
guidelines in the Safety and Regulatory Information document.
– 17 –

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents