Cam Cover Bolt Tightening Sequence - Triumph Tiger Service Manual

Hide thumbs Also See for Tiger:
Table of Contents

Advertisement

3 CYLINDER HEAD & CAMSHAFT
27. Apply silicone sealer to the areas arrowed in the
diagram below.
lace
Silicone Sealer Areas
28. Refit the cam cover and gasket and tighten the cam
cover fixings to 10
Nm.
Tighten the fixings in the
order shown below.
5------------------~
///I:j~+-L-6
3--__________
~~
1-----~~J
2
4
8
Cam Cover Bolt Tightening Sequence
29. Fit a new gasket over the throttle body locating
dowels ensuring that the gasket tab is positioned to
the left hand side.
30. Refit the throttle bodies and tighten the fixings to 12
Nm.
31. Reconnect the idle air control valve electrical
connection.
32. Check for correct, unrestricted throttle operation
and for cable/throttle binding and stioking.
3.26
A
WARNING: Move the handlebars to left
. . . . and right full lock while checking that
cables and harnesses do not bind. Also check for
a sticking throttle. Rectify either condition as
necessary.
A cable or harness which binds will .restrlct the
steering and may cause loss of control and an
accident.
A sticking throttle will lead to loss of motorcycle
control and an accident.
33. Refit the oil feed pipe to the head using new sealing
washers to both sides of the banjo bolt. Tighten the
banjo bolt to 25
Nm.
Ensure that the oil feed pipe is
not distorted during the tightening.
1. Oil Feed Pipe
2. Banjo Bolt "
34. Refit the exhaust system as desoribed in the fuel
system section.
35. Refit the radiator as described in the cooling system
section.
3"6. Refit the thermostat housing and the water pump
hose and tighten the clip.
(
/
(
('
\

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents