1-4
Connecting power to printer
We recommend installing a circuit breaker box within easy reach of the
operator.
•
Install and run the main power cord through a strain relief then into the
channel on the lower right rear of the printer and up to the power control
box on the left side (see diagram below).
•
Connect the main leads to the 4 position or 6 position terminal block and
connect the ground lead to the single ground terminal (see Figures
A,B,C,D).
•
Reinstall the lower side door.
Feed power
through here
•
Energize the main power circuit. You should hear the lamp head and
power supply cooling fans go into a cool-down cycle. Ensure that the
voltage select switch on the hinged control panel is switched to the lit
LED.
•
Install the lower front and rear black trim pieces over the forklift channels,
using a
5
/
" Allen wrench.
32
Z
94MS42 Rev.B1 S/W Ver 2.06