Installation Of Option Boards - iPECS eMG80 Installation Manual

Hide thumbs Also See for eMG80:
Table of Contents

Advertisement

iPECS eMG80
Hardware Description and Installation Manual

4.4 Installation of Option Boards

Prior to installing any option board, assure power is OFF. We recommend wearing a wrist-
strap connected to a known ground. At a minimum, before touching any board discharge any
built-up static charge by touching a grounded object.
To install a board, perform the following Steps as depicted in Figure 4.4 below:
1. Remove the KSU and Cord cover as detailed in section 4.3.
2. For an Interface board, remove the modular jack cover plate as shown in #1.
3. If provided with the board, remove two screws holding the MBU in the locations
indicated in the figure.
4. Insert 2 standoffs through the MBU and into the cabinet. Tighten the standoffs with
Wrench as shown in #2.
5. Holding the board as shown in #3, insert the board carefully in the direction of the
arrow.
6. Carefully align the connector on the board with the mating MBU connector pins, then
push the board down to fully engage the connectors.
7. To securely fix the board in place, insert and tighten 2 screws as shown in #5.
Figure 4.4 Board Installation
24
Issue 1.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents