Kipor IG2000 Shop Manual page 89

Epa/carb/cetl certified models
Hide thumbs Also See for IG2000:
Table of Contents

Advertisement

● Connection rod big end side clearance
Standard(mm)
Service limit(mm)
0.1-.0.4
0.8
● Oil film clearance of connection rod big end
(1) Wipe off the oil on the surface of crankshaft neck.
(2) Set the plastic wire feeler at the crankshaft neck and install the connection rod. Tighten the bolt
to the prescribed torque, pay attention that don't revolve the crankshaft. The tighten torque is 8 to
10N.m.
(3) Disassemble the connection rod, measure the plastic wire feeler thickness.
(4) Replace the connection rod if the clearance exceeds the service limit and measure the
clearance again. Grind the crankshaft neck if the new clearance still exceeds the service limit, and
use the connection rod less than the standard valve.
Standard(mm)
Service limit(mm)
0.040-0.066
0.120
塑料线塞尺
Plastic gauge
88

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ig2000pIg2000s

Table of Contents