Inspection - Kipor IG2000 Shop Manual

Epa/carb/cetl certified models
Hide thumbs Also See for IG2000:
Table of Contents

Advertisement

4. Tighten the crankcase cover bolt slowly to the prescribed torque.
5. Wait 20 minutes after installation before filling with oil and starting the engine
Cylinder block
机体
直径1.5-2mm密封胶
Sealant: 1-1.5mm diameter

12.6 Inspection

● Inspection of oil alarm
(1) Stand the oil alarm, check the oil alarm output wire and copper earth wire, there should be no
continuity.
(2) Bottom up the oil alarm; check again, there should be continuity.
(3) Bottom up the oil alarm completely in the oil, check the float, there should be no continuity.
76

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ig2000pIg2000s

Table of Contents