9.3 Inspection

(1) Ignition coil
● Attach the two leads of meter to the primary coil plug of ignition coil and measure the primary
resistance of the ignition coil.
● Attach one lead of the meter to each terminal of primary coil plugs of ignition coil and the other
lead to the spark plug cap,then measure the secondary resistance of the ignition coil.
(2) Rectifier
Measure the on or off (positive pressure fall) of rectifier with control potentiometer
measurement should agree with the standard as shown in the chart.
Positive
Negative
1
2
3
4
Primary resistance
Secondary resistance
1
2
OFF
ON
ON
ON
ON
OFF
0.8—1.3Ω
15—21kΩ
3
OFF
OFF
OFF
63
, the
4
OFF
OFF
ON