Chapter 6. Factory Integration And Testing - IBM NeXtScale System Planning And Implementation Manual

Table of Contents

Advertisement

Factory integration and
Chapter 6.
testing
IBM provides factory integration and testing as part of the Intelligent Cluster
offering. Recently, the Intelligent Cluster testing process was enhanced, and all
NeXtScale System configurations that are integrated by IBM benefit.
This chapter describes what IBM factory integration provides, what testing is
performed, and the documentation that is supplied.
This chapter includes the following topics:
6.1, "IBM standards" on page 154
6.2, "Testing" on page 155
6.3, "Documentation that is provided" on page 157
© Copyright IBM Corp. 2013, 2014. All rights reserved.
6
153

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nextscale n1200Nextscale nx360 m4

Table of Contents