Evinrude E-tec 75 HP Service Manual page 284

75, 90 hp
Hide thumbs Also See for E-tec 75 HP:
Table of Contents

Advertisement

GEARCASE
ASSEMBLY
"O" Type Gearcases
Loosen retainer screws 1/4 turn.
Install wedge, screw, and washer. Apply Ultra
Lock to threads and torque screw 15 to 20 in. lbs.
(1.7 to 2.3 N·m).
284
Re-torque two retainer screws to 18 to 20 ft. lbs.
(24 to 27 N·m).
Confirm that torque on the wedge screw is 15 to
20 in. lbs. (1.7 to 2.3 N·m).
To complete gearcase assembly, refer to:
LEAK TEST on p. 259
WATER PUMP on p. 262
SHIFT ROD ADJUSTMENT on p. 265
REMOVAL AND INSTALLATION on p. 260
LUBRICANT on p. 258
Propeller Hardware Installation on p. 65
Trim Tab Adjustment on p. 68.
During break-in period of a reassembled gear-
case, change the gearcase lubricant between 10
to 20 hours of operation.
DSM02291
DSC02361

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents