Evinrude E-tec 75 HP Service Manual page 225

75, 90 hp
Hide thumbs Also See for E-tec 75 HP:
Table of Contents

Advertisement

Final torque nuts to 26 to 30 ft. lbs. (35 to 41 N·m).
Apply Nut Lock to crankcase flange screws. Install
screws and torque to 60 to 84 in. lbs. (7 to 9.5
N·m).
Test that the crankshaft spins freely without bind-
ing.
IMPORTANT:
After
assembled, allow at least two hours for Gel-Seal II
to cure before running outboard.
002096
002105
powerhead
has
been
Apply Gasket Sealing Compound to both sides of
a new water cover gasket. Position gasket and
cover on cylinder block.
Apply Nut Lock to screws and double ended stud
and hand start in cover. Place star washer under
J-clamp and position as shown. Torque all screws
to 60 to 84 in. lbs. (7 to 9.5 N·m).
2
1. Double ended stud
2. J-clamp
Install pressure valve assembly. Refer to PRES-
SURE RELIEF VALVE SERVICING on p. 200.
Connect crankcase and block-to-block recirculat-
ing hoses. Check valves must flow toward fly-
wheel end of powerhead. Refer to POWERHEAD
VIEWS on p. 233 for hose routing.
1. Flywheel end
Install the throttle body and reed plate assemblies.
Refer to Intake Manifold Assembly on p. 175.
POWERHEAD
ASSEMBLY
1
002122
10
1
002113
225

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents