Mitsubishi GT16 User Manual page 148

Hide thumbs Also See for GT16:
Table of Contents

Advertisement

(Example:
Dialog box after touching the [Copy] button)
HINT
HINT
HINT
Processing time reference
The time required for the processing depends on conditions such as OS, data capacity, and file structure.
(Reference values)
• When the capacity is 4 Mbytes: Around 6 seconds
• When the capacity is 12 Mbytes: Around 18 seconds
(2) Precautions for operation
(a) Copying project data
If the Boot source drive and copy destination drive for project data is the same, the project data cannot be
copied.
If the drives are the same, cancel the setup.
(b) When project data are copied to the GOT
If OS or project data is copied to the GOT using the CF card or USB memory created with GOT data
package acquisition, the utility setting is also copied.
Check each utility setting after copying to the GOT and change the setting according to need.
(c) CF card or USB memory to be used
When performing GOT data package acquisition, do not store other data to the CF card or USB memory.
If doing so, the previous data will be unavailable.
4 - 15
4.3 Memory/Data Control
2.
The display depends on the status of copy
destination and setup.
Operate with following the displayed dialog
box.
3.
After copying OS and data, the dialog box for
notifying the completion appears.
Touching the [OK] button closes the dialog box.

Advertisement

Table of Contents
loading

Table of Contents