Pre-Installation Planning - Environment
Environment
The HC900 Controller must be mounted in suitable equipment enclosures. That is, all components such as
the Controller rack, I/O Racks, and the Operator Interface manufactured by Honeywell must be mounted in
approved furniture designed for industrial applications.
Consideration should be given to the installation so that the potential for the build-up of static electricity is
minimized or eliminated.
See Environmental Conditions and Approvals on page 199.
42
HC900 Process Controller Installation and User Guide
Revision 19
06/14