Fuel Injection System
Assembly
Assembly the cooler bracket. Apply the specified
torque. After assembling the bracket, assembly
cushions on the bracket and apply the specified torque.
Assembly the cooler
with ECM.
Install o anle o'ring novo.
9.612.0.006.7160 - 05/04
Need help?
Do you have a question about the Acteon and is the answer not in the manual?