Operator Installation - Centsys VECTOR2 Installation Manual

Linear swing gate operator
Table of Contents

Advertisement

9. Operator installation

To simplify the installation process, it is recommended that the existing gate is
removed from the pillar before proceeding.
1. Determine gate opening angle and direction
of operator (inward or outward).
Alternatively the swing angle can be
determined more accurately with the
process detailed on page 31
2. Determine a suitable height for the wall
The gate bracket must fit to a sturdy
point on the gate.
Consider using the optional gate
adaptor kit.
Take care to make sure the operator
is mounted level.
3. Determine where to put the bracket
according to A and B values in the tables on
pages 26, 27, 29 and 30.
Operator must not
foul against bracket
Use Mechano kit
Page 21
120°
70°
110°
100°
90° 80°
FIGURE 20. ESTIMATE SWING ANGLE
FIGURE 21. GATE HEIGHT
A
B
FIGURE 22. BRACKET POSITION
Or
Cut the bracket
Take care to shorten
the wall bracket to prevent
interference with the
operator
FIGURE 23. BRACKET POSITION
Closed
60°
Estimate
swing angle
Gate Bracket
Gate opening angle
120°
60°
100°
70°
110°
90° 80°
Gate opening angle
120°
60°
100°
70°
110°
90° 80°

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vector2 400Vector2 500

Table of Contents