12. Electrical Setup

1. Always check that the circuit breaker in the electrical panel is in the
OFF position, and that all high voltage circuits (more than 42.4V)
are completely isolated from the mains supply before doing any
work.
2. Ensure that all low voltage systems (less than 42.4V) are suitably
protected from damage, by disconnecting all sources of power such
as chargers and batteries before doing any work.
3. All electrical work must be carried out according to the
requirements of all applicable local electrical codes. (It is
recommended that a licensed electrical contractor perform such
work.)

Secure control box to wall

1. Secure the control box to wall using the most
appropriate means.
Be sure to position the wall box so as
not to cause any hazards during and
after the installation.
Preferably mount the wall box:
Out of direct sunlight
At a comfortable working height
Away from garden sprinklers etc.
To allow easy access even when
the gate is ope.

Connect all wiring

2. Connect all the cables as required to the
control card. See pages 39 and 40.
3. When wiring each operator back to the
controller housing, it is recommended to
mount a small junction box adjacent each
operator. Terminate the cable provided on
the operator into this junction box and then
route a new cable from the junction box to
the controller housing.
It is recommended that the installer
tie off the harness in such a way so as
to allow for a 350mm loop between
the cable exit at the back of the
operator and either the mounting
bracket or junction box, to minimise
the flexing of the harness. If a sharp
bend is introduced to the cable
harness, or a loop that is less than
350mm in diameter, the resulting
cable fatigue may cause the actuators
to behave erratically or to stop
operating altogether.
Step 1
For wiring diagram see page 39/40
Page 33
FIGURE 50
Wiring Diagram for Basic Operation
Wiring Diagram for Basic Operation
THIN PURPLE
S Sens1
S Sens1
S Sens2
THIN BLUE or ORANGE
S Sens2
THIN PURPLE
M Sens1
PURPLE
PURPLE
S Sens1
M Sens1
MASTER
BLUE
BLUE
S Sens2
THIN BLUE or ORANGE
PURPLE
PURPLE
M Sense2
PURPLE
PURPLE
M Sens1
M Sense2
THIN RED or GREY
Sens+
BLUE
BLUE
M Sense2
THIN RED or GREY
Sens+
BLUE
BLUE
Sens+
THIN BLACK
Sens-
RED
RED
THIN BLACK
Sens-
RED
RED
Saf CLO
BLACK
BLACK
Sens-
Saf CLO
BLACK
BLACK
Saf CLO
Saf OPE
Saf OPE
Saf OPE
Com
Com
Com
LCK/STP
LCK/STP
LCK/STP
TRG
TRG
PED
TRG
PED
PED
Com
Com
FRX
Com
FRX
LI T
FRX
LED
LI T
Com
LI T
LED
Aux 12V
LED
Com
Com Saf
Com
Aux 12V
Sol
15
15
Aux 12V
Com Saf
Li g ht
Com Saf
SLAVE
Li g ht
15
15
PURPLE
PURPLE
Sol
Batt +
Sol
Li g ht
Bat -
Li g ht
BLUE
BLUE
MTR M+
RED
RED
Li g ht
MTR —
Li g ht
Batt +
Batt +
BLACK
BLACK
Bat -
MTR S+
Bat -
MTR S-
THICK BLUE
MTR M+
MTR M+
THICK BLACK
MTR —
MTR —
MTR S+
THICK BLUE
MTR S+
MTR S-
THICK BLACK
MTR S-
Figure 15 Wiring Diagram
Figure 15 Wiring Diagram
Page 36
Page 36
Page 37
Page 37
FIGURE 51
Junction
Box
FIGURE 52