Setting The Limits - Centsys VECTOR2 Installation Manual

Linear swing gate operator
Table of Contents

Advertisement

4. Check that the charger and battery are
connected to the controller.
Ensure the battery polarity is correct.
5. Switch on the mains supply (via isolator).
6. Ensure that both the controller and charger
are effectively earthed for improved
lightning protection.

Setting the limits

7. Check that the origin has been correctly set.
(See page 24).
8. Check that the gate is closed and the
operator is locked.
9. If powering up the system ex-factory, it will
request for the operating PROFILE
(operating standard) to be set. Select from
the list the PROFILE that will suit the
specific region. With this set, the system
will automatically proceed to the limit
setup menu. Follow the on-screen instruc-
tions to complete the set-up procedure.
If the powering up with the PROFILE set
but no limits set, the system will automati-
cally proceed to the limit setup menu.
Follow the on-screen instructions to
complete the set-up procedure.
If powering up at any stage after that, push
and hold the SETUP button (
three seconds.
For more details about the PROFILE
(operating profile) – refer to page 53.
S Sens1
S Sens2
M Sens1
M Sens2
Sens+
Sens-
Safe CLS
Safe OPN
Com
LCK/STP
TRG
) for
Select the "limits" menu by pressing the
ENTER button (
screen instructions to complete the
setup procedure.
Page 34
Com
FRX
LIT
LED
Com
Aux 12V
Com Saf
Sol
Light
Light
Batt +
Batt -
MTR M+
MTR M -
MTR S+
MTR S -
FIGURE 52
FIGURE 53
FIGURE 54
3 3 3 3 3
AutoClose
AutoClose
AutoClose
AutoClose
AutoClose
Exit
Exit
Exit
Exit
Exit
Exit
Exit
Exit
Exit
Go
Go
Go
Go
Go
Go
Go
Go
Go
Up/Dn
Up/Dn
Up/Dn
Up/Dn
Up/Dn
Up/Dn
Up/Dn
Up/Dn
Up/Dn
FIGURE 55
). Follow the on-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vector2 400Vector2 500

Table of Contents