Weil-McLain CGi Series 3 Installation And Maintenance Manual page 33

Gas-fired
Hide thumbs Also See for CGi Series 3:
Table of Contents

Advertisement

CG i
GAS-FIRED wATER BOILER- sERIEs a -
Boiler Manual
7a
Start-up - preparation
(continued)
Fill the system with water
I. Close manual and
automatic
air
vents
and boiler drain cock.
2.
Fill
to
correct system
pressure.
Correct
pressure will
vary
with
each
application. Typical cold water
fill pressure for
a
residential
system
is
12
psi.
3.
Purge
air
from
system:
a. Connect
a
hose
to
the purge
valve
(see
drai11
valves,
item
6,
in
suggested
piping diagrams
on
pages
23
through
27,
Figure
18
through Figure
23).
Route hose to
an
area
where
water can
drain
and be
seen.
b. Close the
boiler
or system isolation
valve between the purge valve
and
fill cOJmection
to
the system.
c.
Close
zone isolation
valves.
d.
Open quick-fill
valve on
cold
water
makeup
line.
e. Open
purge
valve.
f. One
zone at a
time,
open
the isolation
valves.
Allow water to
run
through
the zone, pushing
out
the
air.
Run
until
no noticeable air
flow
is
present. Close the
zone
isolation
valves and
proceed with
the next
zone. Follow
this
procedure
until
all
zones are purgecl
g.
Close the quick-fill
water valve and purge valve
and
remove
the
hose.
Open
all isolation
valves.
Watch that
system
pressure
rises to
correct
cold-fill
pressure.
h. After the
system
has operated
for
a while,
eliminate
any
residual
air by using
the
manual
air vents
located
throughout
the
system.
i.
If purge valves are not
installed in system, open manual
air vents
in system one
at
a
time, beginning
with
lowest
floor. Close
vent
when water
squirts o
ut
Repeat with
remaining vents.
4.
Open automatic air vent
(diaphragm-type
or
bladder-type
expansion
tank
systems only) one
tum.
5.
Open other
vents:
a. Starting
on the lowest floor, open air
vents
one
at a
time
until
water
squirts out.
b. Repeat with
remaining
vents.
6.
Refill
to
correct
pressure.
Part Number
550-142-780/0712
Inspect system water piping
After filling the boiler
and system with water,
Inspect
all
piping
throughout the
system for leaks.
If
found,
repair
immediately. Repeat this
inspection
after
the
boiler
has
been
started and
the
system
has
heated
up.
I&
WARNING!
ftjHddijj;l
Leaks must
be
repaired
at once.
Failure to
do
so
can
damage the
boiler, resulting
in substantial
prop-
erty
dan1age.
Do
not use
petroleum -based
cleaning or
sealing
compounds
in boiler
system.
Severe
dan1age
to
boiler
will
occur, resulting
in
sub-
stantial
property damage.
Inspect base insulation
I&
WARNING!
I&
WARNINGI
The
boiler
contains
ceramic fiber
and fiberglass
materials.
Use
care
when
handling
these materials
per
instructions
on
Page
70
of this
manual.
Failure
to
comply could
result
in
severe
personal
injury.
Failure
to replace
damaged
insu-
lation or
reposition
insulation
can
result in
a
fire
hazard, causing severe
personal
injury, death
or
substantial
property damage.
Check to make sure
base
Insulation Is
secure
against
all
four
sides of
the
base. If
insulation
is damaged or
displaced,
do not
operate boiler. Replace or
reposition
insulation.
33