Weil-McLain CGi Series 3 Installation And Maintenance Manual page 18

Gas-fired
Hide thumbs Also See for CGi Series 3:
Table of Contents

Advertisement

CG i
GAS-FIRED
wATER BOILER-
sERIEs a -
B
oiler
Manual
3f
Venting - direct exhaust- installation
I&
WARN
ING!
18
1. Do
not mix types or
manufacturers of
vent
materi-
als.
2.
Clean
all joints
before
sealing. See vent
manufac-
turer'
s
instructions for cleaning
and sealing joints.
Use their
specified sealant.
Do
not
use
screws.
3.
Install vent pipewithseams
on
top
of vent
horizon-
tal
runs. Follow
requirements in Section
3e
for vent
termination.
4.
Maintain
mininmm
2"
clearance
from combustible
materials to vent
pipe.
5.
Vertical
venting
-
See
Figure
13.
Follow vent
manufacturer•s
instructions
fo
r
venting
through
roof.
Vent
pipe must extend through roof
flashing,
jacket
or
thimble.
Vent
may pass
through floor,
inside
wall
or
concealed space
when
installed according to
vent
manufacturees instructions.
Sidewall
venUng
-
See
Figures 14 and
15.
Vent
must temtinate
at
least one
foot above
anticipated
snowline.
Vent
must
be
terminated
only with:
Tee
or elbow with
integral
screen.
(Tee may be
mounted either vertically
or
horizontally.
DO
NOT
use
horizontal
tee
with
CGi-7 or CGi-8.)
Elbow
and
termination
coupling
with
screen
(not
available
for
StaR-34).
6.
Do
not
seal
vent
pipe
(slip connector
for
Saf-TVent)
to
inside
or
outside
plate.
7. If passing
through
noncombustible wall, provide
hole
diameter large enough
to insert
the vent pipe
(slip
connector for
Saf-TVent).
8.
Install
horizontal
drain
tee
as dose
as
possible
to
boiler,
in
first horizontal
run. See
Figures 13
and
14.
9.
Do
not exceed
the
maxin1un1 vent
system
length
given
in
Table
4, page
15.
Condensate
drain
line
-
use only silicone tubing
rated
for
at
least 400•F
for
the
first 18"
of condensate
drain
line,
then other
non-metallic
tubing
may be used.
Us-
ing
any
other material could
cause flue gas leakage,
potentially resulting
in
severe
personal injury,
death or
substantial property damage.
On
some
installations,
the
condensate
drain firting
may
be omitted, provided:
Vent
manufacturer
shows
this
option in
their
instruc-
tions.
Vent is sloped toward
termination
as
shown
in dotted
lines
in
Figure
14.
The
vent
is installed per WeB-McLain and
vent
manufacturer's
instructions.
Condensate
drippage
from
such
vents
may
acaunu-
late
on
the
gromtd
below.
Consider traffic
in
the
area
to
avoid
hazard due to
ice accumulation.
Agure
13
Olrect
exhaust
vertical
venting
Hortzonlal
drain
tee,
Follow vent
manufocturefs
Instructions to
Install
condensate d rain
line.
Follow
vent
monulocturefs
fnstruclions
for proper
lnstololion ol vent
runs,
Including
slope
and
support.
71015
Figure 14
Direct exhaust
sidewall
venting
Fdbw vent
\
\
manulacture~s
instructioos
1o<
proper lns1alation of
vent
runs,
including
slope,
s~port
and
oondensate
drailage.
L.lJJ
Horizontal
drain
tee.
Rllowwnt
m
anulacwrefs
instructions to instal
condensate
drain line.
1 -
Optional downward
1
slope
without
drail
1
fitting,
where alowed
1
by
wnt
manufacturer
r
as
expelled
In
CPJJnON
at
left.
71016
Part Number 550-142-780/0712

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgi-25Cgi-5Cgi-4Cgi-6Cgi-8Cgi-7

Table of Contents