Weil-McLain CGi Series 3 Installation And Maintenance Manual page 10

Gas-fired
Hide thumbs Also See for CGi Series 3:
Table of Contents

Advertisement

CG i
GAS-
FIRED wATER BOILER- sERIEs a -
B
oiler
Manual
1
e
Prepare boiler location - air openings
I&
WARNING
I
*
Combustion air opening
location
and sizing
requirements
depend
on the
clearances around
the
boiler. Check the boiler
placement compared
to
Figure
I
a,
page
7.
If
all clearances are
at least
equal
to
Figure
1a,
page
7,
apply
the
sizing
and placement
of opening$
given on pages
lO
and
I
I.
If
ANY
clearance
Is Jess than
Figure
1
a, page
7,
you must
provide air openings sized and located as
shown
in Figure
lb,pa!>e
7.
DO
NOT applythe
siz.ing
and
location
informatiOn
shown
on
page
I
0
or
I
I.
Figure
2
*
Figure
3
Air openings must be provided
*
Combustion
air and
ventilation
openings
must
comply
the
National
Fuel
Gas
Code
ANSI
Z223.
I
-
latest edition, or
applicable
local building
codes.
Canadian installations must comply
with
Bl49.
1
or
Bl49.2
Installation
Codes.
I&
WARNING!
Provide
adequate
combustion and
ventilation
air
to
assure proper
combustion
and reduce the risk
of severe
personal injury,
death
or
substantial
property damage
caused
by flue gas spillage
and
carbon
monox ide
emissions.
Air opening options
TWo
openings
- Air
supply
from
Inside
the building
*
t.
If
the
building
is of
unusually tight
construcUon
(see
definition, next
page),
the
building
must
also be prcwlded
with
air openings dlrecUy
to the
outside, sized
and
located
per
Figure 3,
Figure 4
or
Figure
5.
2.
Buildings
of
typical
construction
should
provide adequate
combustion
air
from natural infiltration,
so
additional
air
openings to
the building
are
not
required.
3. See
Figure
2.
Provide
two
openings
through the
interior
wall,
within
12 inches of
the
ceiling
and
the
floor,
sized
per
Figure
2.
TWo
openings
- Air
supply
directly from outside
*
Figure
4
*
I.
Air
openings must
be
directly
through
an
outside
wall,
or
into
a
space
Figure 5
that connects directly to
the outside
(such
as a
ventilated
attic
or
crawl
space, for
exam
ple).
2. See
Figure
3-
Openings directly
through
an outside wall
-
_provide
*
two
openings
within 12
inches
of
the
ceiling
and
the
floor,
SIZed per
Figure
3.
3. See
Figure 4
-Air
supplied
through
vertical ducts
-
provide
two
openings terminated
within
12
inches of
the
ceiling
and
the floor,
sized
per
Figure
4.
4.
See
Figure
5
-
Air
supplied
through horizontal
ducts
-
provide
two
openings
within 12
inches of
the
floor
and
the
ceiling, sized
per
Figure
5.
tO
Air
openings to
Interior
spaces
Each opcnii)Q ff'Oo
urea
1
sq.
inr.h
per
1,000 lltuh
Air
directly
through outside wall
EIIClh
opaning
lro•
an:n
=
1
:r;q.
1nch
per 4,000
Btuh
Air
from
outdoors
-
vertical
duels
Out$1de or
ven1Ha1 ed aulc
E.::lch opening Into
III'Oll
a
1
sq.
inch
per
4.000
Btuh
-
...
.. ..
V cm!llol<ld
Ull1TJ1lll
Cl'swt space
tJUJU:/JJJ
Air
from
outdoors
-
horizontal
ducts
Eect.
opening f;ee area
'"'
1
sq.
lneh
pet
2.000
Btuh
''"
,
....
Part Number
550-142-780/0712