Preparing the MVME167 for Installation
Refer to the setup procedures in the manuals for your particular
chassis or system for additional details concerning the installation
of the MVME167 into a VME chassis.
Table 3-7. MVME167 Preparation Procedure
Step
1
Install/remove jumpers on headers according
chapter and as required for your particular application.
Jumpers on header J1 affect 167Bug operation as listed in
Settings. The default condition is with all eight jumpers installed.
A jumper installed/removed on header J2 enables/disables the
system controller function of the MVME167.
Install jumpers on headers J6 and J7 to configure serial port 4 to
use clock signals provided by the TRXC4 and RTXC4 signal lines.
2
ConÞgure adapters and transition modules
transition module
3
Ensure that EPROM devices are properly installed in their sockets.
Factory configuration is with two EPROMs installed for the
MVME167Bug debug monitor, in sockets XU1 and XU2.
Action
user's manuals.
Preparing the Hardware
to the
Jumper Settings
according to the MVME712X
3
in this
Jumper
3-13