Hardware Preparation And Installation; Introduction; Unpacking Instructions; Hardware Preparation - Motorola M68360QUADS-040 User Manual

Table of Contents

Advertisement

Freescale Semiconductor, Inc.

2 - Hardware Preparation and Installation

2.1

INTRODUCTION

This chapter provides unpacking instructions, hardware preparation, and installation instructions for the
M68360QUADS-040.
2.2

UNPACKING INSTRUCTIONS

If the shipping carton is damaged upon receipt,
request
unpacking and inspection of equipment.
Unpack equipment from shipping carton. Refer to packing list and verify that all items are present. Save
packing material for storing and reshipping of equipment.
AVOID TOUCHING AREAS OF INTEGRATED
CIRCUITRY;
DAMAGE CIRCUITS.
2.3

HARDWARE PREPARATION

To select the desired configuration and ensure proper operation of the M68360QUADS-040 board,
changes of the Dip-Switch settings may be required before installation. The location of the switches, LEDs,
Dip-Switches, and connectors is illustrated in FIGURE 2-1. The board has been factory tested and is
shipped with Dip-Switch settings as described in the following paragraphs. Parameters can be changed for
the following conditions:
ADI port address
Enable/Disable MC68EC040's caches (both Instruction and Data)
Eanble / Disable MC68LC040's Memory Management Unit
Hardware BreakPoint logic operation
Parity Error Interrupt generation
Arbitration Configuration
EEST Twisted Pair Interface configuration
User Selectable Options
1. If a MC68 LC 040 device is installed.
M68360QUADS-040 Hardware User's Manual
NOTE
carrier's
agent
CAUTION
STATIC
For More Information On This Product,
Go to: www.freescale.com
Hardware Preparation and Installation
be
present
during
DISCHARGE
CAN
1
11

Advertisement

Table of Contents
loading

Table of Contents