Preparing The Hardware; Modifying Conþguration Before Installation; Option Modification - Motorola MVME167 Series Installation Manual

Single board computer
Hide thumbs Also See for MVME167 Series:
Table of Contents

Advertisement

Preparing the Hardware

This section covers:
Modifying Configuration before Installation
To select the desired configuration and ensure proper operation of
the MVME167, certain option modifications may be necessary
before installation.
The location of the switches, jumper headers, connectors, and LED
indicators on the MVME167 is illustrated in
Option Modification
The MVME167 has provisions for option modification via:
Modifying hardware configurations before installation
Checking the 167Bug EPROMs
Factory jumper settings
Preparing your MVME167
Preparing the system chassis
Software control for most options
Jumper settings on headers for some options
Bit settings in control registers after installation for most
other options
Ð Control registers are described in the Single Board
Computer Programmer's Reference Guide as listed in Related
Documentation in Chapter 1 of this manual.
Preparing the Hardware
Figure
3-1.
3-5
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents