Figure 2-2 Measurement To Wall (Gen 4); Figure 2-3 Measurement To Wall (Gen 5); Figure 2-4 7/16 Inch Holes In Bus Roof; Figure 2-5 Carriage Bolts & Sealant - Carrier Transport Air Conditioning Installation Procedures Manual

Transport air conditioning, split systems generation 4 & 5
Table of Contents

Advertisement

Table 2-3 DISTANCE TO BACK WALL (GEN 4)

GEN 4 Evaporator
EM-1
EM-2
EM-3
EM-6
EM-14

Table 2-4 DISTANCE TO BACK WALL (GEN 5)

GEN 5 Evaporator
EM-1
EM-2
EM-3
EM-7

Figure 2-2 Measurement To Wall (GEN 4)

BUS REAR WALL
Back of Top Panel
Filter Assembly
Return Air
Mounting Holes

Figure 2-3 Measurement To Wall (GEN 5)

h
Locate center of bus ceiling and mark.
i
Centering the template against back wall and
ceiling, mark the bus ceiling and wall for evaporator
mounting holes and drain lines.
j
Using a 3/16 drill bit, drill 4 holes through the bus
ceiling. The smaller bit will allow you to check the angle
of the hole and where you have exited the bus roof. If the
angle is incorrect, the 3/16th hole is easily repaired with
a pop-rivet.
k
After determining the pilot hole is correct enlarge
the 4 holes to 7/16 inch. See Figure 2-4.
Distance to back wall
7 Inches
7 Inches
4.5 Inches
7 Inches
8.75 Inches
Distance to back wall
4.125 Inches
4.125 Inches
4.125 Inches
4.125 Inches
4.125 In.
Mounting Holes
Cover
2--3

Figure 2-4 7/16 Inch Holes in Bus Roof

l
Matching holes in reinforcing rails to holes in bus
roof, drop 3/8 inch carriage bolts through mounting rails
and the roof. The carriage bolts should drop through the
roof easily. You may have to open the holes slightly, Do
not force the bolts through the roof or ceiling.
Figure 2-5 Carriage Bolts & Sealant
m Pull reinforcing rails and carriage bolts away from
bus roof. Apply a bead of sealant down the center of
each rail and under the carriage bolt heads. See
Figure 2-6 and Figure 2-7.

Figure 2-6 Sealant Pattern on Mounting Channel

T--311

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents