Figure 29: Contents Of The Shipping Crate - Juniper MX480 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX480:
Table of Contents

Advertisement

MX480 3D Universal Edge Router Hardware Guide
Related
Documentation
54
To unpack the router (see
Move the shipping crate to a staging area as close to the installation site as possible,
1.
where you have enough room to remove the components from the chassis. While the
chassis is bolted to the pallet, you can use a forklift or pallet jack to move it.
Position the shipping crate with the arrows pointing up.
2.
Open all the latches on the shipping crate.
3.
Remove the front door of the shipping crate cover and set it aside.
4.
Slide the remainder of the shipping crate cover off the pallet.
5.
Remove the foam covering the top of the router.
6.
Remove the accessory box and the Quick Start installation instructions.
7.
Verify the parts received against the lists.
8.
Remove the vapor corrosion inhibitor (VCI) packs attached to the pallet, being careful
9.
not to break the VCI packs open.
To remove the brackets holding the chassis on the pallet, use a 1/2-in. socket wrench
10.
and a number 2 Phillips screwdriver to remove the bolts and screws from the brackets.
Store the brackets and bolts inside the accessory box.
11.
Save the shipping crate cover, pallet, and packing materials in case you need to move
12.
or ship the router at a later time.

Figure 29: Contents of the Shipping Crate

Verifying the MX480 Router Parts Received on page 55
Installing the MX480 Router Mounting Hardware for a Rack or Cabinet on page 57
Installing the MX480 Router Using a Mechanical Lift on page 66
Tools Required to Install the MX480 Router with a Mechanical Lift
Tools Required to Install the MX480 Router Without a Mechanical Lift on page 75
Figure 29 on page
54):
Copyright © 2011, Juniper Networks, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents