Install The Feb; Figure 28: Remove The Feb - Juniper M10 Hardware Manual

Juniper router hardware guide
Hide thumbs Also See for M10:
Table of Contents

Advertisement

Replace Packet Forwarding Engine Components

Figure 28: Remove the FEB

Install the FEB

To install the FEB, follow this procedure (see Figure 29):
1.
2.
3.
4.
5.
6.
7.
8.
9.
86
M5 and M10 Internet Routers Hardware Guide
Verify that the power switch on both power supply faceplates is in the OFF (O) position.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect
the strap to one of the ESD points on the chassis. For more information about ESD, see
"Prevent Electrostatic Discharge Damage" on page 134.
Verify that the ends of the ejector levers (which are located at each end of the unit) are
pulled away from the faceplate and are nearly perpendicular to it.
Place one hand under the FEB to support it and grasp one of the ejector levers at
the front with the other hand.
Align the rear of the FEB with the guides inside the chassis and slide it in completely.
Press the end of each ejector lever inward toward the FEB faceplate.
Replace the Routing Engine cover on the FEB faceplate, by sliding the hooks at the
bottom of the cover under the lower edge of the FEB ejector levers and aligning the
holes in the cover with the holes in the faceplate (the cover is shown in Figure 3). Insert
screws into the five holes in the cover and use a Phillips screwdriver to tighten them.
Perform the procedures in "Power On the Router" on page 67to power on the router
and verify correct startup.
Issue the show chassis feb command described in "Maintain the FEB" on page
76 to verify correct FEB functioning.

Advertisement

Table of Contents
loading

This manual is also suitable for:

M5

Table of Contents