Confirming Battery Charger Operation - Xantrex XW4024 230 50 Installation Manual

Xw hybrid inverter/charger
Table of Contents

Advertisement

Confirming Battery Charger Operation

975-0384-01-02
Figure 2-19 Checking AC Voltage
To confirm battery charger operation:
1. Apply AC from grid or generator, and then confirm voltage.
2. Check LEDs (AC1 or AC2) on the front panel. One of them must be on for the
unit to charge. Check the amp "A" LED. If the "A" LED is on, the unit is
charging and the battery current is displayed on the information panel.
Figure 2-20 Checking Charging Operation
Important: Unless the inverter/charger settings have been changed, the inverter
will charge as if it has a large (> 440 Ah) flooded battery bank (factory default
setting). Therefore, ALL systems may need to have the battery charging set
points configured to avoid damage to the batteries.
This completes the functional test. If all tests pass, the inverter is ready for use. If
any of the inverter's internal set points need to be adjusted, consult the
configuration chapter of the operation guide.
This manual for use by qualified personnel only
Basic Functional Test - Single Inverter
AC
AC IN
OUT
N
L
L
AC
GRID
LOAD
(AC1)
Amp ("A") LED
AC IN
L
N
N
GEN
(AC2)
2–31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xw4548 230 50Xw6048 230 50

Table of Contents