Configuration Examples - NEC Express5800 140He User Manual

Server
Table of Contents

Advertisement

4-4

Configuration Examples

The following describes examples of configuration required to use software-link features or for system operations.
Link with Management Software
To link with the temperature monitoring feature of ESMPRO Agent
Select [Server] - [Thermal Sensor] - [Enabled].
To control power supply of the server with ESMPRO Manager via the network
Select [Advanced] - [Advanced Chipset Control] - [Wake On Lan/PME] - [Enabled].
Select [Server] - [AC-LINK] - [StayOff].
UPS
To link power supply with the UPS
To power on the server when power is supply from the UPS
Select [Server] - [AC-LINK] - [Power On].
To keep the server off-powered even when power is supplied from the UPS if the POWER switch was used to
power off
Select [Server] - [AC-LINK] - [Last State].
To keep the server off-powered even when power is supplied from the UPS
Select [Server] - [AC-LINK] - [StayOff].
Boot
To change the boot order of devices connected to the server
Select [Boot] and specify the boot order.
To display POST check results
Select [Advanced] - [Boot-time Diagnostic Screen] - [Enabled].
You can also press Esc while our logo is on the screen to display POST check results.
To control from the HW console
Select [Server] - [Console Redirection] and set each item.
Memory
To enable the memory degradation feature
Select [Advanced] - [Memory/Processor Error] - [Halt].
To check the installed memory (DIMM board) status
Select [Advanced] - [Memory Configuration] and check the status indications.
The on-screen DIMM group numbers and socket locations on the IO board are associated as shown in the
following figure.
To clear the memory (DIMM board) error information
Select [Advanced] - [Memory Configuration] - [Memory Retest] - [Yes] and reboot.
Select [Server] - [Clear FRU LED] - [Yes] and reboot.*
* Only when [Server] - [FRU LED Feature] - [Enabled] has been selected.

Advertisement

Table of Contents
loading

Table of Contents